Demolition of Hornibrook Highway Bridge Redcliffe
Extraction of 1,000 piles & lifting 15t headstocks to barges
BP – Crude Wharf
Removal & replacement of 100 headstocks & girders – lifting of pipeline was required to enable the replacement of headstocks
BP – Crude Wharf
Removal of Gangway & all hydraulic components and replacement of
BP – Product Wharf
Remove & replace 20m of under wharf headstock – replace 8m of 300 x 300 wharf girders – All bolts and fasteners around girders replaced
BP – Crude Wharf (Diving Works)
Remove & replace 2 Fire Main Strainers
BP – Maintenance
Regularly supply Marine Plant & Equipment for BP Contractors for painting and electrical works etc.
BP – Product Wharf
Remove & replace 4 Trelleborg Fenders
SIbelco – Pinkenba
Headstocks & Girders to under wharf & replacement of all Fender Piles as per yearly maintenance
Sibelco – Dunwich
Remove & replace broken Fender Piles and Headstock
Cement Australia – Pinkenba
Yearly maintenance to front of wharf – remove & replacement of damaged fender piles from shipping.
Cement Australia – Pinkenba
Diving inspections of Timber Structures Under Wharf
Stradbroke Ferries – Cleveland – Dunwich – Redland Bay Terminals
All steel & timber piling works for Ferry & Barge Terminals
Incitec – North & South (TMS Contracted by Brady Marine)
Wharf repairs & piling works
Caltex – Product Wharf
Remove Wheaton Arm from product wharf at Fisherman’s Island
Caltex
Placement of Steel Piles to front of Crude Wharf
Lifting of broken piles from under wharf
Caltex
Lift & crane works to enable painting & servicing of Wheaton Loading Arms
Maritime Safety QLD
Removal and replacement of Goat Island and the Banana Banks beacons.
Maritime Safety QLD
Ongoing Salvage works up & down the East Coast of Queensland
Maritime Safety QLD
Stabilization works for Tangalooma Wrecks
Maritime Safety QLD – Pinkenba
Repairs & piling works MSQ
Tangalooma Ferry Launches – Tangalooma and Pinkenba Wharfs
Pile driving & repair works
Port of Brisbane (Whyte Island)
Extraction and driving of new pile
Redland City Council – Russell Island – Karraggara Island– Macleay Island– Raby Bay
Berthing pile replacements & piling works
Baulderstone
Demolition of Main Wharf at Fisherman Island
Envirosite
Dutton Park Ferry Terminal Demolition
Waterways Construction – Coochiemudlo Ferry Terminal
Driving of 8 x 900 steel piles – 20 x 450 steel piles – 10 x timber piles
Redland City Marina
Driving of 130 x 300 steel piles
Golding Contractors – Shorncliffe
Demolition of Shorncliffe Pier
Golding Contractors – Serenity Cove
Driving of 4 x 610 steel piles – construction of Serenity Cove Lock
Comisky Group – Sandstone Point Hotel
Installing 50m concrete pontoon & piling works
Pensar Building – Karragarra Barge Ramp
Installation of 4 x 720 steel piles